Customization: | Available |
---|---|
Type: | Central Air Conditioners |
Capacity: | Project Customization |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
*Commercial buildings (offices, hotels, retail spaces).
*Residential complexes.
*Hospitals and schools.
*Historic buildings where ductwork is impractical.
3. What are the lead times for delivery and installation?
Standard lead times range from 15 weekdays, depending on customization.
For large projects, confirm phased delivery options to align with construction schedules.
4. What after-sales support and maintenance services are critical?
*Remote Monitoring: Cloud-based diagnostics for proactive maintenance.
*Spare Parts Availability: Confirm lead times for critical components.
5. What technical specifications should I prioritize when selecting a VRF system?
Focus on:
*Capacity Range: Ensure the system matches your building's cooling/heating load (BTU/h or kW).
*IPLV (Integrated Part Load Value): Higher IPLV indicates better efficiency at partial loads.
*Refrigerant Type: Opt for systems using low-GWP refrigerants (e.g., R-32) for sustainability compliance.
*Heat Recovery Capability: Critical for projects requiring simultaneous heating/cooling.
*Noise Levels: Check dB ratings for indoor/outdoor units, especially for noise-sensitive environments.
6. What are the key cost considerations beyond the initial purchase price?
*Installation Complexity: Ductwork requirements, refrigerant piping length, and electrical upgrades.
*Lifecycle Costs: Include energy consumption, maintenance contracts, and potential downtime.
*Warranty Terms: Prioritize suppliers offering extended warranties on compressors and inverters.
7.If I want to buy a vrf system, how do I get started?